Oak Tree Bridge – Photos of Progress

Share

December 4th, 2009 by webmaster

The beginning – demolition of the low water crossing – 4/23/2009

Low-water-crossing-demo

Road is ready to drill the piers – 5/6/2009

ready-to-drill-piers

Drill rigs for piers – 5/15/2009

drill-rigs-for-piers

Piers are complete! – 5/21/2009

piers-complete

Pouring columns – 6/2/2009

pouring-columns

Columns complete! – 6/5/2009

columns-complete

Pouring the bent cap – 6/11/2009

pouring-the-bent-cap

Finished bent cap – 6/17/2009

finished-bent-cap

Setting beams – 7/28/2009

setting-beams

All 25 beams set in place – 7/28/2009

all-25-beams-set-in-place

Setting precast panels

setting-precast-panels

Continuous deck steel – 8/27/2009

continous-deck-steel

IMG_1371

IMG_1375

IMG_1381

Pouring the bridge rail – 9/30/2009

pouring-bridge-rail

Oak Tree Bridge side view – 11/2/2009

Oak-Tree-Bridge-side-view