<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:georss="http://www.georss.org/georss" xmlns:gml="http://www.opengis.net/gml"
	>
<channel>
	<title>Comments on: Williams Drive Widening Project</title>
	<atom:link href="http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/feed/" rel="self" type="application/rss+xml" />
	<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/</link>
	<description></description>
	<lastBuildDate>Thu, 11 Mar 2010 21:41:44 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Jim O'Neill</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-791</link>
		<dc:creator>Jim O'Neill</dc:creator>
		<pubDate>Thu, 11 Mar 2010 21:41:44 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-791</guid>
		<description>Maybe someone can give me a logical answer to the following question
I travel on Williams drive almost every day and I am totally confused on the way this project is being constructed. It appears to have no logical direction in that it appears to me  that an area is excavated, utilities of some type are installed and then back filled and compacted shortly afterward this same area is excavated again and the same process is completed a second time.
Why did&#039;nt the PM or the GC start at one end and complete the work thats being done and proceed down Williams Dr.until you get to the other end???
I&#039;m not an Engineer however I have been involved in construction forover 35 yearsand this project has got me stumped!</description>
		<content:encoded><![CDATA[<p>Maybe someone can give me a logical answer to the following question<br />
I travel on Williams drive almost every day and I am totally confused on the way this project is being constructed. It appears to have no logical direction in that it appears to me  that an area is excavated, utilities of some type are installed and then back filled and compacted shortly afterward this same area is excavated again and the same process is completed a second time.<br />
Why did&#8217;nt the PM or the GC start at one end and complete the work thats being done and proceed down Williams Dr.until you get to the other end???<br />
I&#8217;m not an Engineer however I have been involved in construction forover 35 yearsand this project has got me stumped!</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Bill Dryden</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-750</link>
		<dc:creator>Bill Dryden</dc:creator>
		<pubDate>Mon, 07 Dec 2009 19:34:11 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-750</guid>
		<description>The current construction plans for Williams Drive Project call for installation of street lights at signalized intersections only as safety enhancement lighting.

Bill Dryden, P.E.
Transportation Engineer
City of Georgetown
(512) 930-8096
BDryden@georgetowntx.org</description>
		<content:encoded><![CDATA[<p>The current construction plans for Williams Drive Project call for installation of street lights at signalized intersections only as safety enhancement lighting.</p>
<p>Bill Dryden, P.E.<br />
Transportation Engineer<br />
City of Georgetown<br />
(512) 930-8096<br />
<a href="mailto:BDryden@georgetowntx.org">BDryden@georgetowntx.org</a></p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Sally Custer</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-746</link>
		<dc:creator>Sally Custer</dc:creator>
		<pubDate>Sat, 05 Dec 2009 16:48:20 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-746</guid>
		<description>Please tell me there will not be a string of continuous street lights on Williams after it is completed.  Our neighborhood already has lighting intrusion from the new funeral home as well as lights from businesses on Williams Drive. Thank you for your response.</description>
		<content:encoded><![CDATA[<p>Please tell me there will not be a string of continuous street lights on Williams after it is completed.  Our neighborhood already has lighting intrusion from the new funeral home as well as lights from businesses on Williams Drive. Thank you for your response.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Keith Hutchinson</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-718</link>
		<dc:creator>Keith Hutchinson</dc:creator>
		<pubDate>Thu, 01 Oct 2009 14:59:13 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-718</guid>
		<description>There will be two travel lanes in each direction with shoulders, plus a continuous two way left turn lane throughout the length of Williams Drive.  The shoulders provide a place for bicyclists.

Bill Dryden, Transportation Engineer</description>
		<content:encoded><![CDATA[<p>There will be two travel lanes in each direction with shoulders, plus a continuous two way left turn lane throughout the length of Williams Drive.  The shoulders provide a place for bicyclists.</p>
<p>Bill Dryden, Transportation Engineer</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: HUNTER ANDERSON</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-717</link>
		<dc:creator>HUNTER ANDERSON</dc:creator>
		<pubDate>Thu, 01 Oct 2009 14:17:07 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-717</guid>
		<description>will the shoulders  still be as wide so cyclist can still ride safely?</description>
		<content:encoded><![CDATA[<p>will the shoulders  still be as wide so cyclist can still ride safely?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Keith Hutchinson</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-689</link>
		<dc:creator>Keith Hutchinson</dc:creator>
		<pubDate>Fri, 04 Sep 2009 21:44:07 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-689</guid>
		<description>From Clayton Weber, construction project manager for PBS&amp;J: 
Yes and it should be very soon. The sign was damaged by the contractor during waterline installation. The brick pillars were rebuilt quickly, but the sign is taking longer. As soon as it arrives from the sign company it will be installed.</description>
		<content:encoded><![CDATA[<p>From Clayton Weber, construction project manager for PBS&amp;J:<br />
Yes and it should be very soon. The sign was damaged by the contractor during waterline installation. The brick pillars were rebuilt quickly, but the sign is taking longer. As soon as it arrives from the sign company it will be installed.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Scott</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-688</link>
		<dc:creator>Scott</dc:creator>
		<pubDate>Fri, 04 Sep 2009 20:36:21 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-688</guid>
		<description>Is the sign at the entrance of Gabriel Estates (Penny ln) going to be replaced?</description>
		<content:encoded><![CDATA[<p>Is the sign at the entrance of Gabriel Estates (Penny ln) going to be replaced?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Webmaster</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-664</link>
		<dc:creator>Webmaster</dc:creator>
		<pubDate>Mon, 03 Aug 2009 13:48:08 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-664</guid>
		<description>The sign structure opposite Del Webb Boulevard, along the south side of Williams Drive, will be taken down and salvaged by the contractor for the Williams Drive Widening Project.

Bill Dryden, P.E.
Transportation Engineer
City of Georgetown
(512) 930-8096
BDryden@georgetowntx.org</description>
		<content:encoded><![CDATA[<p>The sign structure opposite Del Webb Boulevard, along the south side of Williams Drive, will be taken down and salvaged by the contractor for the Williams Drive Widening Project.</p>
<p>Bill Dryden, P.E.<br />
Transportation Engineer<br />
City of Georgetown<br />
(512) 930-8096<br />
<a href="mailto:BDryden@georgetowntx.org">BDryden@georgetowntx.org</a></p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Morris Greenberg</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-662</link>
		<dc:creator>Morris Greenberg</dc:creator>
		<pubDate>Sun, 02 Aug 2009 16:16:42 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-662</guid>
		<description>Who will take down and dispose of the sign structure on the south side of Williams Dr. opposite Del Webb Blvd?</description>
		<content:encoded><![CDATA[<p>Who will take down and dispose of the sign structure on the south side of Williams Dr. opposite Del Webb Blvd?</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Kristin Best</title>
		<link>http://facilities.georgetown.org/2009/07/24/williams-drive-widening-update/#comment-630</link>
		<dc:creator>Kristin Best</dc:creator>
		<pubDate>Tue, 09 Jun 2009 18:11:58 +0000</pubDate>
		<guid isPermaLink="false">http://facilities.georgetown.org/?p=74#comment-630</guid>
		<description>Is 3405 connecting to 4-T Ranch Rd/subdivision?</description>
		<content:encoded><![CDATA[<p>Is 3405 connecting to 4-T Ranch Rd/subdivision?</p>